featuring WISE West Northamptonshire Highways & Transport Β· concept Β· Aug–Sep 2026 sample data

WISE β€” live network data

The council's highway data hub, in one place. Pick a section to explore.

πŸ“Š

Overview

Headline stats, response by priority (P1–P4), and where repair methods are being used.

πŸ“

My area

Search a parish for its full picture β€” defects, drainage, road condition and more, all in one report.

πŸ—ΊοΈ

Map

Every completed and scheduled repair, plotted on a real map.

πŸ›£οΈ

Road condition

HEAT-scored carriageway sections and the resurfacing priority list.

πŸ’§

Drains & gullies

Gully inspections, flow issues, and what's actually clogging the network.

❄️

Winter gritting

Treatment log, live simulated gritter tracking, and salt usage.

πŸ”

Track a report

Look up a specific report by reference, road or parish.

🚧

Report an issue

Report a new highway problem β€” category, location on the map, and a photo.

πŸ—“οΈ

Forward programme

What's scheduled, when, and the permit status of each scheme.

πŸ“ˆ

Transparency & spend

Network scale, road condition trend, spending, and the annual works programme.

WNConnect

News, updates and live network information from West Northamptonshire Highways & Transport β€” one place for site visits, scheme updates, the winter gritting picture, and the WISE data hub itself.

Campaign No Defect Left Behind New P4 repairs β€” now within 3 months Sign up Get the Highways newsletter

Latest from the service

Want the numbers behind the headlines?

WISE is our live network data hub β€” defects, drainage, gritting, the forward works programme and more.

Articles

Micro, Mini and Standard articles β€” the same three tiers the service uses to keep sign-off proportionate to reach: unsigned weekly notes up to full quarterly features with Kier Group and WNC sign-off.

Highway Maintenance newsletter

A preview of what the next send looks like β€” built automatically from the same data and articles as the rest of the site.

What's happening on the network

A rolling snapshot of highway defects, drainage inspections and asset work across the borough. Figures below cover the sample period, 1 August – 17 September 2026.

Defects received vs completed

ReceivedCompleted

Parishes with the most open defects

ParishOpen

Response by priority

P1–P4 are the council's core response bands, each with its own target: P1 within 24 hours, P2 within 7 days, P3 within 28 days, P4 within 26 weeks.

Repair methods in use

Where each repair technology has been deployed, drawn from crew site-visit records matched to a job location. Only of logged method visits in this sample also matched a geocoded job β€” treat this as an indicative pattern, not a full picture.

Map tiles Β© OpenStreetMap contributors. Click a dot for the job it relates to.
Click a point to see which job used that method.

Area repaired, by method

MethodVisitsPatchesTotal mΒ²Avg mΒ² / visit

Based on all logged method visits in the sample (not only the geocoded subset shown on the map above), so figures here run larger than the map's point count.

My area

Search a parish or town to see everything logged there in one place β€” what's been fixed, what's still open, and where it all is.

Search for a parish or town above to see its full picture.

Reported issues near you

Showing completed and scheduled works only, on a real map of the network.

Completed Scheduled
Map tiles Β© OpenStreetMap contributors. Click a point for details.
Click a point on the map to see the full report.

Road condition & forward programme

Every carriageway section the council's HEAT (Holistic Evaluation and Assessment Tool) model has scored for possible resurfacing, drawn from the 2025 network condition survey. This is a separate system from the P1–P4 defect priorities elsewhere in this app β€” HEAT ranks planned resurfacing schemes, not reactive repairs.

No map here: this dataset records road name, ward and parish but not GPS coordinates, so sections can't be plotted without further geocoding work.

Sections flagged, by treatment

Programme cost, by treatment

HEAT score distribution

Higher scores indicate greater benefit relative to cost under the council's model β€” these sections rank higher for future programmes.

Most-flagged wards

Scheme priority list

Ranked by the model's scheme priority β€” lower numbers rank higher.

Priority Road Ward Treatment Length (m) Condition Cost

Gully & drainage health

Built from cyclical gully inspections across the borough. "Flow issue" means the gully was not left running freely at the point of inspection; "not cleaned" means the node was left as found rather than cleared.

Where the assets are

Newly logged drainage assets with GPS coordinates in this sample β€” click a point for details.

Drainage asset
Map tiles Β© OpenStreetMap contributors. Only newly logged assets carry coordinates in this sample β€” the full gully network isn't geocoded here.
Click a point on the map to see the asset's details.

Inspections carried out

Share left with a flow issue

Same time grouping as the chart on the left.

Condition on leaving site

What's found in the gullies

By parish

Parish Ward Inspections Flow issue Not cleaned

Winter gritting log

Every treatment decision made by the duty officer, with the rationale behind it. Sample covers November 2025 gritting activity.

Live gritter tracking β€” simulated

A working preview of what live fleet tracking could look like on this site, once gritters are fitted with GPS telematics. The five routes and vehicle positions below are simulated, not real β€” no gritter data is currently fed into this system.

Map tiles Β© OpenStreetMap contributors. Routes are illustrative loops between parish centres, not real gritting circuits.

Fleet status (simulated)

Treatments over time

Track a report

Search by reference number, road name or parish to see where a report stands.

Report a highway issue

Tell us what's wrong and roughly where. Council teams triage every report and assign a priority band before scheduling work.

1. What's the problem?

2. Where is it?

Click the map to drop a pin, or use your location.

3. Describe it

4. Your details (optional)

Only used if we need more information β€” not required to submit.

Concept only β€” nothing here leaves your device. A real version would create a job in the council's highway maintenance system.

Forward programme

Live from the council's works-tracking export β€” real scheduled dates, traffic management and permit status for upcoming construction. This is a different source from the Transparency tab's annual scheme list and from the HEAT road-condition model: this is the operational build schedule, updated as work is planned and permitted.

Schemes starting, by month

Permit status

By works category

What submitted GPS road sections could look like

A mockup, not real data: seven example schemes shown as line sections rather than single points, anchored to each parish's approximate centre. Once real GPS traces are submitted per scheme, the actual road alignment would render here instead.

Illustrative road section (mockup)
Map tiles Β© OpenStreetMap contributors. Lines are illustrative placeholders, not surveyed geometry β€” click one for details.
Click a line on the map to see the scheme it represents.

All scheduled works

Start Site Parish Category Duration Permit Link

Transparency & spend

The council's official Department for Transport highways maintenance transparency report β€” network scale, road condition, spending and the works programme, published annually. This is separate from the live operational sample shown elsewhere in this concept.

Source: West Northamptonshire Council, Local Highways Maintenance Transparency Report, last updated 14 September 2026. Read the full report β†—

The network we maintain

Road condition, 2023–2025

Green: good condition. Amber: may need maintenance soon. Red: poor condition, considered for maintenance.

A roads

B & C roads

U roads β€” % in poor (red) condition

Potholes & response times

PriorityTarget response
Emergency2 hours
P124 hours
P27 days
P328 days
P426 weeks

See the Overview tab for how the sample data is actually performing against P1–P4 today.

What we spend, and where it comes from

2026–27 figures are projected.

Spend by asset type

Funding source

Planned works, 2026/27

The published forward programme of named schemes. Delegated minor-works budgets that fund works across the year, without a single named site, are included too.

CategoryWardScheme / locationPlanned start